Methodology
How monytr calculates CO₂ and energy.
Methodology version 1.0 · 15 November 2026
This page explains how monytr calculates the CO₂ and energy figures for your machines and vehicles, so that you, your client or your auditor can check every figure.
Principles.
- We follow the GHG Protocol Corporate Standard (2004): Scope 1, Scope 2 and the relevant parts of Scope 3.
- Scope 2 is location-based: the country's average grid factor, unless you enter your own electricity contract's factor.
- Biogenic CO₂ from biofuels is reported separately, outside the scopes.
- Nothing is offset or netted. "Saved compared with diesel" is never subtracted from any total.
- Emission factors are used exactly as published, with their source and edition.
What we calculate.
| Figure | How |
|---|---|
| Scope 1 | Fuel × tank-to-wheel factor |
| Scope 2 | Electricity used by the machine or vehicle × grid factor (or contract factor) |
| Scope 3.3 | Fuel and electricity × well-to-tank factor (production and transport) |
| Well-to-wheel | Fuel × published well-to-wheel factor |
| Biogenic CO₂ | Fuel × biogenic factor, shown separately |
| Energy | Fuel × heating value + electricity, in MWh, renewable and non-renewable |
Where the fuel data comes from.
For each machine and period we use the best available source, in this order:
- the machine's fuel counter;
- the consumption the machine reports itself;
- an average consumption you enter;
- an estimate from operating hours and engine power, using the European emission inventory guidebook method (EMEP/EEA);
- no data: the figure stays empty.
Every report shows coverage: the share of your operating hours that is measured, estimated or unknown. Unknown is never counted as zero.
Emission factors.
| Your company's country | Fuels | Electricity |
|---|---|---|
| Belgium | co2emissiefactoren.be (valid since 1 January 2023) | Grey electricity Belgium (list 2023, data 2022) |
| Netherlands | co2emissiefactoren.nl (2026 edition) | Grid mix Netherlands 2026 |
| Other EU countries | Belgian list | EEA figure for that country |
| Other | Belgian list | EU average |
- A value missing from the Belgian list? That applies to LPG, biogenic CO₂ and heating values. We then use the Dutch value and say so. HVO30 is calculated from HVO100 and fossil diesel (30/70).
- Each year uses that year's factors, or the latest available edition. A new edition never changes years already reported. Only a correction of an error does, and we record it.
- Rounding: the lists round each value separately. As a result, Scope 1 + Scope 3.3 can differ from the published well-to-wheel total by at most 0.001 kg per litre.
Electricity.
- We report the electricity used by the machine or vehicle itself, excluding charging losses. Your full Scope 2 comes from your electricity bill.
- For machines that can run on diesel or on mains power, we use the share of operating hours on mains that you enter.
Energy.
- Heating values come from co2emissiefactoren.nl, e.g. 35.9 MJ per litre for pump diesel B7.
- The renewable share is calculated by energy content, not by volume: B7 is 6.4% renewable. For electricity we use the national share, or your contract's share if you enter it.
Limits.
- No market-based Scope 2 beyond an entered contract factor.
- No Scope 3 categories other than 3.3.
- monytr is not a certification or audit: your certification body assesses your inventory.
Changes.
| Version | Date | Change |
|---|---|---|
| 1.0 | 15 November 2026 | First publication |